Published January 25, 2018
There has been more maintenance achieved over the later part of 2017 - the deck has been completely covered in, painting completed on some of the buildings and the shower block floors including the disabled block have been resprayed and...
» Read more...
Published January 23, 2018
The bride did all the decorating herself and the groom made the archway by Higgins Grove and the wooden holders beside the rows which held rose petals (instead of confetti). The couple supplied the tables and chairs for inside, white...
» Read more...
Published January 23, 2018
APPLICATIONS NOW CLOSED.
» Read more...
Published May 09, 2017
We have given the lounge in the dorm a bit of a makeover - the ceiling has been steam cleaned and the chairs and sofas replaced. A great place to kick back and relax!
» Read more...
Published March 17, 2017
Thanks to a generous donation from the Valder Trust we have been able to convert out hot water supply from electric to gas.
» Read more...